Projects (as Main Contractor)
New Built Works Construction:
Residential Building, No. 4 Kent Road, Kowloon Tong
Residential Building, No. 147 Waterloo Road, Kowloon Tong
Composite Development at No.245-247,Tai Kok Tsui Road, Kowloon
Commercial Building, 40 Kimberley Road, Tsim Sha Tsui
Residential Building Works, 11 Sha Tin Ridge Road, Sha Tin
Seng Tak Central School Building Project, New Clear Water Road, Kowloon
Commercial Development 24A &24B Granville Road,
No.8-12, Yuen Long Pau Cheung Square, Yuen Long
Composite Building On K.I.L 11238 At Nos 445-447 Shangshui street, Kowloon
E&M Works Construction:
Sha
Redecoration Work
和明(míng)以主承建商的身份完成了:
1.尖沙咀金巴利(lì)道40
2.香(xiāng)港觀(guān)塘新清水灣道重置(zhì)香港扶幼會(huì)盛德中(zhōng)心學校建築(zhù)工程(整單所有項目)
3.
4.沙(shā)田火炭數據中心工程(機電(diàn)設(shè)備連(lián)裝修)
5.
7.九龍塘根德道4號單幢式住宅
8.九龍(lóng)塘窩打(dǎ)老道147號單幢式住(zhù)宅
9.尖沙咀加連威(wēi)老道24A&24B大廈
10.元朗炮仗坊 8-12號
11.旺角上海街445號住宅大
12. 屯門環保園廢紙回收廠房及其他相關的發展項目之P1
Projects (as Sub Contractor)
Civil Engineering:
Hong Kong's Siu Sai Wan Park Drainage Project,
Tung Chung Road Extension Project, and other steel structures, pavements, channel works, concrete structures and drainage works.
Hong Kong Siu Sai Wan Park Steel Structure Project, Stainless Steel Project,
Phase III Reclamation 2009/19 project of the steel railing project, airport railway depot steel structure.
A&A Works Construction:
The renovation project of Sha
Steel Structure Engineering
Shanghai Lu Pu Bridge Steel Structure Engineering.
Design and manufacture of installation works:
Mobile safety fence in the Wan Chai - Central Phase II reclamation works.
Other projects completed by the Company include:
Shatin Vista Paradiso external area ; site wooden & steel decoration work